Featured Posts

Construction site visit

January 12, 2017

We have noticed through all these years that one of the most important factor to a successful project is to follow the construction phase with great attention. So many times, things change on site per new conditions, building inaccuracy or clients review. Decisions are being taken without the lighting designer inputs.

Most of the time, to their defense, the changes are not directly related to lighting. However, if a matte painted wall is now a shiny tiled wall, the lighting effect will definitely be affected and it will differ from the lighting design intent. 

The lighting designer should be present to construction meetings and stop by project sites to be kept in the loop, this will allow the project to unfold successfully.

 

 

Please reload

Blodgett-Calvin Residence featured in Dwell (Sept 2016)

September 10, 2016

1/7
Please reload

Recent Posts

January 12, 2017

November 15, 2014

Please reload

Archive
Please reload

Search By Tags
Please reload

    • Instagram
    • LinkedIn Social Icon
    • Facebook Social Icon

    © 2014 by Arsène Design